Projects
Project Highlights RJ Jackson
Wildfire Casino-Lake Mead,NV
Client: Station Casinos Incorporated.
Value: $3.35M
Duration: August 2021 – Present
Main Objectives:
Mechanical scope:
Electrical scope:
Plumbing scope:
Installation of (7) 5-ton rooftop units
New ducting runs
New lease space stub outs
Vent and waste pipes for new restroom fixtures
New gas and water meters
Installation of new roof draining system
New gas line connections
Landscape and Civil scopes:
Expansion of existing casino space and creation of a new restaurant
New construction of approximately 12,000 sq. ft.
82,500 sq. ft. of landscaping
Coordination of public utility installations and relocations
Site surveying
Grading of 82,500 sq. ft.
25,000 sq. ft. of backfill
Compaction
Trenching for new utilities
New grease trap installation
Concrete scope:
Other Responsibilities:
Installation of new switchgear
Lighting control panels
Parking lot light poles
New switchboard
Distribution and outlets for wall/floor power
Pouring of new footings
A-curbs
Transformer pad
Light pole bases
Approximately 5,000 sq. ft. of 4" sidewalk
Guiding design team to realize customer's vision
Installation of structural steel moment frames for future expansion
Responsible for permitting and expediting
First project manager to work with the client for the company
Since the first project in 2019, the client has awarded the company five projects, each of which I have been the assigned project manager.
Zoox–San Francisco,California
Client: Zoox (an Amazon Company)/Gensler Architecture
Duration: March 2022 – November 2022
Value: $15M - Office Space, $4M – R&D Space
Worked as Project Manager
Completed build-out of office building and research and development lab space for Robo Taxi division
Completed full gut and remodel
Did MEP upgrades for lab space
Toca Madera Restaurant-Las Vegas,Nevada
Client: Noble 33/ Monochrome Architectural Designer
Duration: Oct 2021 – July 2022
Worked as Project Manager
Tasked with completing the build-out of a 10,000 square foot space for Noble 33, an international hospital brand expanding into the Las Vegas market.
Utilized longstanding relationships with Inspectors, local subcontractors, and CCBD administration.
Ensured the build was completed to the client's high standards.
Facilitated the closing out of inspections and permits for the project.
Armani Brand Group
Duration: July 2020 – Feb 2022
Worked as Project Manager
Tenant improvement project
Completed build-out of new tenant spaces for Giorgio Armani Brand in Houston, Texas and Las Vegas during the pandemic, adhering to the contracted schedule.
Currently working on the Rodeo Dr. location, which is still in progress.
Client specifically requested to manage all projects awarded to them.
Experience in working with Italian millworkers and project managers.
Effective communication and relatability due to having lived in Turin, Italy.
Chica Restaurant,Venetian Hotel,Las Vegas,Nevada
Client: 50 Eggs Hospitality Group/Sands Corp/Rockwell Design Firm
Duration: July 2021 – December 2021
Worked as Project Manager
Did tenant improvement that included building out of bar, kitchen, and dining areas.
Installed 400lf of custom grease ducting.
Flew to Wichita, Kansas to meet with the ducting fabricator and negotiated shorter 20-day lead time for ducting fabrication
Also negotiated long lead times during a time of supply shortages to ensure the schedule was met.
Landed Wakuda project with 50 Eggs/Sands Corp after completing Chica Restaurant.
Boulder Station Buffet Conversion
Client: Station Casinos Incorporated
Duration: March 2021 – August 2021
Worked as Project Manager
Demolished existing casino buffet
Conversion of buffet area into a food court
Creation of six new tenant spaces
Successfully awarded the build-out of the tenant spaces
Exceeded the preferred fee by 33%
TAO Beach Expansion–Las Vegas,NV
Duration: November 2019 – Present
Client: Sands Corp/TAO Hospitality Group
Value: $40M
Worked as Assistant Project Manager
Design-Build project
Demolition of current Tao Beach Pool Club (18,000 Sqft atop Venetian Hotel) down to structural slab
Construction of new pool club with an estimated size of 40,000 Sqft
Includes 27 Cabanas, 3 bars, 1 kitchen, 3 pool vessels, 3 plunge spas, and 1 DJ proscenium
Extension of elevator from nightclub to pool deck
Installation of escalator from nightclub level to pool deck
It was considered the biggest project for the company
Viceroy Public Space and Model Rooms–Santa Monica,CA
Duration: January 2020 – July 2020
Client: Viceroy/Pebblebrook/BKG
Worked as Assistant Project Manager
Demolished all 1st floor public spaces and installed a new indoor/outdoor bar
Added meeting rooms, boardrooms, check-in area, employees dining area, and offices.
Constructed new pool cabanas and concrete patio
Enhanced landscape and outdoor areas and built storage rooms
Brought the space up to code
Modified Porte cochere and entrance landscaping
Relocated 2nd floor office spaces
Remodeled fitness center
Revamped 6 model rooms
Successfully delivered the project despite Covid-19 delays
First project with owner and owner's rep
Secured three additional projects as a result of the work
LAVO Italian Restaurant–Las Vegas,NV
Client: Sands Corp/Brookfield Properties/TAO Hospitality Group
Duration: March 2020
Worked as Project Manager
Installed mag door holds per code
Brought existing space up to current code
Tied in current sound and PA systems into fire alarm and BMS
Santa Fe Hotel and Casino Room Remodel–Las Vegas,NV
Client: Station Casinos
Duration: October 2019 – January 2020
Worked as Assistant Project Manager
Remodeled 200 keys
Remodel included demo, new paint, vinyl wall covering, new showers, vanities, and tiles
Asked to repair roof due to leaks. Delivered per contracted date
Palms Hotel & Casino Kaos Nightclub Enclosure–Las Vegas, NV
Client: Station Casinos Incorporated
Duration: August 2019 – October 2019
Worked as Project Manager
Installed steel dome enclosure over pool deck area for Kaos Nightclub
Increased sellable real estate during winter months
Generated more revenue for Kaos Nightclub
Custom dome steel structure also included electrical upgrades
Project delivered per contracted turnover date despite 2-week steel delay
First project for company with this client
Secured five additional projects as a result of successful completion
Montage Laguna Beach Room Renovation-Laguna Beach,CA
Client: Strategic Hotels
Duration: November 2018 – April 2019
Worked as Onsite Project Engineer
Remodeled 300 Keys included suites and bungalows
Expertly managed logistical challenge involved in the remodeling process
Did full demolition of sleep area and bathroom
Installation of new features
Successful completion within the contracted turnover date
Property achieved record-breaking sale price per key after the remodel
Project Highlights RJ Jackson
Wildfire Casino-Lake Mead,NV
Client: Station Casinos Incorporated.
Value: $3.35M
Duration: August 2021 – Present
Main Objectives:
Expansion of existing casino space and creation of a new restaurant
New construction of approximately 12,000 sq. ft.
Mechanical scope:
Installation of (7) 5-ton rooftop units
New ducting runs
-
Electrical scope:
•Installation of new switchgear
•Lighting control panels
•Parking lot light poles
•New switchboard
•Distribution and outlets for wall/floor power
Plumbing scope:
•New lease space stub outs
•Vent and waste pipes for new restroom fixtures
•New gas and water meters
•Installation of new roof draining system
•New gas line connections
Landscape and Civil scopes:
•82,500 sq. ft. of landscaping
•Coordination of public utility installations and relocations
•Site surveying
•Grading of 82,500 sq. ft.
•25,000 sq. ft. of backfill
•Compaction
•Trenching for new utilities
•New grease trap installation
Concrete scope:
•Pouring of new footings
•A-curbs
•Transformer pad
•Light pole bases
•Approximately 5,000 sq. ft. of 4" sidewalk
Other Responsibilities:
•Guiding design team to realize customer's vision
•Installation of structural steel moment frames for future expansion
•Responsible for permitting and expediting
•First project manager to work with the client for the company
•Since the first project in 2019, the client has awarded the company five projects, each of which I have been the assigned project manager.
Zoox–San Francisco,California
Client: Zoox (an Amazon Company)/Gensler Architecture
Duration: March 2022 – November 2022
Value: $15M - Office Space, $4M – R&D Space
Worked as Project Manager
Completed build-out of office building and research and development lab space for Robo Taxi division
Completed full gut and remodel
Did MEP upgrades for lab spaces
Toca Madera Restaurant-Las Vegas,Nevada
Client: Noble 33/ Monochrome Architectural Designer
Duration: Oct 2021 – July 2022
Worked as Project Manager
Tasked with completing the build-out of a 10,000 square foot space for Noble 33, an international hospital brand expanding into the Las Vegas market.
Utilized longstanding relationships with Inspectors, local subcontractors, and CCBD administration.
Ensured the build was completed to the client's high standards.
Facilitated the closing out of inspections and permits for the project.
Armani Brand Group
Duration: July 2020 – Feb 2022
Worked as Project Manager
Tenant improvement project
Completed build-out of new tenant spaces for Giorgio Armani Brand in Houston, Texas and Las Vegas during the pandemic, adhering to the contracted schedule.
Currently working on the Rodeo Dr. location, which is still in progress.
Client specifically requested to manage all projects awarded to them.
Experience in working with Italian millworkers and project managers.
Effective communication and relatability due to having lived in Turin, Italy.
.
Chica Restaurant,Venetian Hotel,Las Vegas,Nevada
Client: 50 Eggs Hospitality Group/Sands Corp/Rockwell Design Firm
Duration: July 2021 – December 2021
Worked as Project Manager
Did tenant improvement that included building out of bar, kitchen, and dining areas.
Installed 400lf of custom grease ducting.
Flew to Wichita, Kansas to meet with the ducting fabricator and negotiated shorter 20-day lead time for ducting fabrication
Also negotiated long lead times during a time of supply shortages to ensure the schedule was met.
Landed Wakuda project with 50 Eggs/Sands Corp after completing Chica Restaurant.
Boulder Station Buffet Conversion
Client: Station Casinos Incorporated
Duration: March 2021 – August 2021
Worked as Project Manager
Demolished existing casino buffet
Conversion of buffet area into a food court
Creation of six new tenant spaces
Successfully awarded the build-out of the tenant spaces
Exceeded the preferred fee by 33%
TAO Beach Expansion–Las Vegas,NV
Duration: November 2019 – Present
Client: Sands Corp/TAO Hospitality Group
Value: $40M
Worked as Assistant Project Manager
Design-Build project
Demolition of current Tao Beach Pool Club (18,000 Sqft atop Venetian Hotel) down to structural slab
Construction of new pool club with an estimated size of 40,000 Sqft
Includes 27 Cabanas, 3 bars, 1 kitchen, 3 pool vessels, 3 plunge spas, and 1 DJ proscenium
Extension of elevator from nightclub to pool deck
Installation of escalator from nightclub level to pool deck
It was considered the biggest project for the company
Viceroy Public Space and Model Rooms–Santa Monica,CA
Duration: January 2020 – July 2020
Client: Viceroy/Pebblebrook/BKG
Worked as Assistant Project Manager
Demolished all 1st floor public spaces and installed a new indoor/outdoor bar
Added meeting rooms, boardrooms, check-in area, employees dining area, and offices.
Constructed new pool cabanas and concrete patio
Enhanced landscape and outdoor areas and built storage rooms
Brought the space up to code
Modified Porte cochere and entrance landscaping
Relocated 2nd floor office spaces
Remodeled fitness center
Revamped 6 model rooms
Successfully delivered the project despite Covid-19 delays
First project with owner and owner's rep
Secured three additional projects as a result of the work
LAVO Italian Restaurant–Las Vegas,NV
Client: Sands Corp/Brookfield Properties/TAO Hospitality Group
Duration: March 2020
Worked as Project Manager
Installed mag door holds per code
Brought existing space up to current code
Tied in current sound and PA systems into fire alarm and BMS
Santa Fe Hotel and Casino Room Remodel–Las Vegas,NV
Client: Station Casinos
Duration: October 2019 – January 2020
Worked as Assistant Project Manager
Remodeled 200 keys
Remodel included demo, new paint, vinyl wall covering, new showers, vanities, and tiles
Asked to repair roof due to leaks. Delivered per contracted date
Palms Hotel & Casino Kaos Nightclub Enclosure–Las Vegas, NV
Client: Station Casinos Incorporated
Duration: August 2019 – October 2019
Worked as Project Manager
Installed steel dome enclosure over pool deck area for Kaos Nightclub
Increased sellable real estate during winter months
Generated more revenue for Kaos Nightclub
Custom dome steel structure also included electrical upgrades
Project delivered per contracted turnover date despite 2-week steel delay
First project for company with this client
Secured five additional projects as a result of successful completion
Montage Laguna Beach Room Renovation-Laguna Beach,CA
Client: Strategic Hotels
Duration: November 2018 – April 2019
Worked as Onsite Project Engineer
Remodeled 300 Keys included suites and bungalows
Expertly managed logistical challenge involved in the remodeling process
Did full demolition of sleep area and bathroom
Installation of new features
Successful completion within the contracted turnover date
Property achieved record-breaking sale price per key after the remodel
.
Project Highlights Marcus Jackson
Jupiter Power
Project: Crossett Substation BESS.
Value: $2.1M
Worked as Project Manager
1100+ helical piers installed for new substation and battery storage facilities
Excavated pit and installed 18 piles
Installed geo-membrane for (2) transformer containment pads
Welded cap with anchor bolts for direct structure placement on piles
Surveyed each pile location with 1/4" tolerance on vertical elevation and 1/8" horizontal placement
Responsible for project budget, schedule, and communication with internal and external stakeholders
Exxon
Project: ExxonMobil Permian Crude Venture
Value: $11M
Worked as Project Manager
Installed and surveyed 1000+ helical piers for pipe rack, tanks, and various skidded structures.
Intertied the project after a third of its completion.
Tackled challenges related to site readiness, engineering changes, fluid priority areas.
Maintained consistent communication with all stakeholders.
Successfully completed the 2nd and 3rd phases under my direction.
Rosendin
Project: Madero Project
Value: $5M
Worked as Project Manager
Installed over 1700 piles for battery and substation project
Faced challenges in the early stages of the project due to design issues
Experienced changes in helical pier production
Collaborated with the client's Engineer of Record (EOR), customer, and internal engineering department
Successfully obtained approval for a redesign within a timely manner
Initiated production of new piles based on the approved redesign
Completed installation at one site on time for client structure setup
NCAA FINAL FOUR MARCH MADDNESS
Project: 30,080sq ft. Production Space
Worked as Operations Specialist
Complex buildings provided for ESPN, DirecTV, Fox, and Turner Sports
Coverage of NCAA Men's Final Four 2016
Artist buildings for Final Four Music Fest
Over 35 plus office buildings used
Locations spread out throughout inner city Houston
Modified spaces based on customer-signed drawings
Fox Sports
Project: Super Bowl LI 18,314sq ft. Production Space
Worked as Asst. Branch Manager
Provide the following office needs to Fox Sports division for Superbowl: (9) 24x64 office complex for production, lunch and dinner and green rooms. Also provided a 72x56 complex for command center, one 10x44 office modular for VP of production. Modified space according to customer signed drawings.
Provided the following office needs for Fox Sports division for Superbowl:
(9) 24x64 office complex for production, lunch, dinner, and green rooms.
72x56 complex for command center.
One 10x44 office modular for VP of production.
Modified space according to customer signed drawings.
Gamma Construction
Project: Langham Creek High School – 33,352sq, ft.
Worked as Project Manager
Delivered the following structures to the client during school renovation:
(20) 24x64 classrooms
(2) 14x70 restrooms
12x56 administration office
Modified floor plans based on customer-signed drawings
Coordinated with the supporting branch to ensure readiness and delivery schedule
Set up buildings in compliance with local authority requirements
Installed skirting for the buildings
Equipped each classroom with:
8x4 marker boards
4x4 tac boards
Data outlets at specific locations
Created a third office in the administration building
Provided panic device hardware, fire extinguishers, and electrical conduits for an emergency alarm system
Placed panic devices, fire extinguishers, and electrical conduits at specific locations determined by the customer.
Project Highlights Marcus Jackson
Jupiter Power
Project: Crossett Substation BESS.
Value: $2.1M
Worked as Project Manager
1100+ helical piers installed for new substation and battery storage facilities
Excavated pit and installed 18 piles
Installed geo-membrane for (2) transformer containment pads
Welded cap with anchor bolts for direct structure placement on piles
Surveyed each pile location with 1/4" tolerance on vertical elevation and 1/8" horizontal placement
Responsible for project budget, schedule, and communication with internal and external stakeholders
Exxon
Project: ExxonMobil Permian Crude Venture
Value: $11M
Worked as Project Manager
Installed and surveyed 1000+ helical piers for pipe rack, tanks, and various skidded structures.
Intertied the project after a third of its completion.
Tackled challenges related to site readiness, engineering changes, fluid priority areas.
Maintained consistent communication with all stakeholders.
Successfully completed the 2nd and 3rd phases under my direction.
.
Rosendin
Project: Madero Project
Value: $5M
Worked as Project Manager
Installed over 1700 piles for battery and substation project
Faced challenges in the early stages of the project due to design issues
Experienced changes in helical pier production
Collaborated with the client's Engineer of Record (EOR), customer, and internal engineering department
Successfully obtained approval for a redesign within a timely manner
Initiated production of new piles based on the approved redesign
Completed installation at one site on time for client structure setup
NCAA FINAL FOUR MARCH MADDNESS
Project: 30,080sq ft. Production Space
Worked as Operations Specialist
Complex buildings provided for ESPN, DirecTV, Fox, and Turner Sports
Coverage of NCAA Men's Final Four 2016
Artist buildings for Final Four Music Fest
Over 35 plus office buildings used
Locations spread out throughout inner city Houston
Modified spaces based on customer-signed drawings
Fox Sports
Project: Super Bowl LI 18,314sq ft. Production Space
Worked as Asst. Branch Manager
Provide the following office needs to Fox Sports division for Superbowl: (9) 24x64 office complex for production, lunch and dinner and green rooms. Also provided a 72x56 complex for command center, one 10x44 office modular for VP of production. Modified space according to customer signed drawings.
Provided the following office needs for Fox Sports division for Superbowl:
(9) 24x64 office complex for production, lunch, dinner, and green rooms.
72x56 complex for command center.
One 10x44 office modular for VP of production.
Modified space according to customer signed drawings.
Gamma Construction
Project: Langham Creek High School – 33,352sq, ft.
Worked as Project Manager
Delivered the following structures to the client during school renovation:
(20) 24x64 classrooms
(2) 14x70 restrooms
12x56 administration office
Modified floor plans based on customer-signed drawings
Coordinated with the supporting branch to ensure readiness and delivery schedule
Set up buildings in compliance with local authority requirements
Installed skirting for the buildings
Equipped each classroom with:
8x4 marker boards
4x4 tac boards
Data outlets at specific locations
Created a third office in the administration building
Provided panic device hardware, fire extinguishers, and electrical conduits for an emergency alarm system
Placed panic devices, fire extinguishers, and electrical conduits at specific locations determined by the customer.
Almeda
Project: Genoa Constructors, 18,384sqft
Worked as Asst. Branch Manager
Office Space Delivered (4)14x66 office modules, 36x56 office complex, 48x56 office complex, 6 custom lab containers & 144x 56 office complexes. QA/QC at various times during the office production phase Modified space according to customer signed drawings. Managed project schedule, all communications, contract docs and all stakeholders’ expectations daily. Performed buy out process with multiple vendors and selected contractor of my choice to complete scope.
Office Space Delivered:
(4) 14x66 office modules
36x56 office complex
48x56 office complex
6 custom lab containers
144x56 office complexes
Quality Assurance/Quality Control:
Conducted QA/QC at various times during the office production phase
Modified space according to customer signed drawings
Project Management:
Managed project schedule
Handled all communications, contract documents, and stakeholders' expectations on a daily basis
Performed buyout process with multiple vendors
Selected contractor of choice to complete scope